Answer
May 11, 2026 - 01:04 PM
For 120V dirt installation, no mounting is included, but the fixture can be threaded into a 1/2 inch NPT (National Pipe Thread), and a PVC Rocket Post is available as an optional accessory. Threaded mounting offers secure installation for higher voltage setups, and the Rocket Post adds flexibility for different soil types.
