Answer
Feb 12, 2025 - 10:14 AM
For 120V installations in dirt, there is no mounting included, but it threads into a 1/2″ NPT, with an optional PVC rocket post available. The threaded option provides a secure fit for existing structures, and the rocket post adds stability if needed for 120 volt led flood lights.